Difference between revisions of "LabLynx KB:System/scheduling"
From LIMSWiki
Jump to navigationJump to searchShawndouglas (talk | contribs) (Created article.) |
Shawndouglas (talk | contribs) (Corrected related question link.) |
||
Line 16: | Line 16: | ||
*[[LabLynx KB:LIMS/data entry]] | *[[LabLynx KB:LIMS/data entry]] | ||
*[[LabLynx KB:LIMS/reports/control charts]] | *[[LabLynx KB:LIMS/reports/control charts]] | ||
*[[LabLynx KB:System/ | *[[LabLynx KB:System/reporting/ad-hoc query]] | ||
*[[LabLynx KB:LIMS/system: test, test group, QC template, QC test]] | *[[LabLynx KB:LIMS/system: test, test group, QC template, QC test]] | ||
*[[LabLynx KB:LIMS/system: master parameter, process, path, contract lab, sample type]] | *[[LabLynx KB:LIMS/system: master parameter, process, path, contract lab, sample type]] | ||
[[Category:LabLynx KB:ELab-O training material]] | [[Category:LabLynx KB:ELab-O training material]] |
Latest revision as of 21:04, 1 October 2011
![]() |
This is an article specific to the Category:LabLynx knowledge base. Its context outside of LabLynx, Inc may not be apparent, thus why it appears inside the LabLynx KB namespace. |
About the training material
This is training material (in the form of a PowerPoint file) for setting up scheduling in the main system module of the Oracle-based version of ELab.
Additional files
att98.PPT (223233 bytes)