Difference between revisions of "LabLynx KB:System/scheduling"

From LIMSWiki
Jump to navigationJump to search
(Created article.)
 
(Corrected related question link.)
 
Line 16: Line 16:
*[[LabLynx KB:LIMS/data entry]]
*[[LabLynx KB:LIMS/data entry]]
*[[LabLynx KB:LIMS/reports/control charts]]
*[[LabLynx KB:LIMS/reports/control charts]]
*[[LabLynx KB:System/scheduling]]
*[[LabLynx KB:System/reporting/ad-hoc query]]
*[[LabLynx KB:LIMS/system: test, test group, QC template, QC test]]
*[[LabLynx KB:LIMS/system: test, test group, QC template, QC test]]
*[[LabLynx KB:LIMS/system: master parameter, process, path, contract lab, sample type]]
*[[LabLynx KB:LIMS/system: master parameter, process, path, contract lab, sample type]]


[[Category:LabLynx KB:ELab-O training material]]
[[Category:LabLynx KB:ELab-O training material]]

Latest revision as of 21:04, 1 October 2011

About the training material

This is training material (in the form of a PowerPoint file) for setting up scheduling in the main system module of the Oracle-based version of ELab.

Additional files

att98.PPT (223233 bytes)

Related questions